Ver.1.8
Tasks Dashboard
Manual Search
On Day Tasks
Authorisation
Parts
Deployment
Abandon
Confirmed Escalated
Missing Jobs
☰
Authorisation
Claim ID :
1615666
Job Type :
Boiler Breakdown
Job No :
4
Post Code :
UB1 2BT
Parts Required :
Yes
Authorisation Total Parts + Labour :
126.00
Type of Repair :
Please Select
Boiler
System
Boiler & System
Plumbing
Parts Needed :
Please Select
Yes
No
Parts Total (inc VAT):
Additional Time Required :
Please Select
0 Mins
30 Mins
1 Hour
1 Hour 30 Mins
2 Hours
2 Hours 30 Mins
3 Hours
3 Hours 30 Mins
4 Hours
4 Hours 30 Mins
5 Hours
5 Hours 30 Mins
6 Hours
6 Hours 30 Mins
7 Hours
7 Hours 30 Mins
8 Hours
3 Hours 30 Mins
9 Hours
JobOutcome:
Please Select
authorisation required
Review Case
Insufficent Time to Complete
Not Covered
Out of Skill Set
Part Not Available
BER
Classifications:
Please Select
Safe to Use
At Risk
At Risk Turned off
ID Capped Off
Referred to ESP
Part 1 Description:
Part 2 Description:
Part 3 Description:
Part 4 Description:
Part 5 Description:
Note :
Arrived onsite checked drop test found 1/2 bar drop in the boiler no drop in the pipes work, checked outside found water in the dischar pip, leak water from PRV, required replacement, origina PRV in the boiler press, called navien they give p.code 30002251A plastic PRV need to check with Lee Holmes.
×
Deployment Note
Note :
×
Parts
×
Confirtm Parts Tab
Are You Confirm to Delete Tab along With all Parts!
Yes
No
Booking Link
×
×
Auth